Environmental Services

Project Examples       

Stillwater Flood and Retaining Wall Project, Stillwater, MN

Client Needs

This project provides flood control and protection to the city of Stillwater. The project is divided into three stages. Stage 3 includes constructing a low floodwall/levee along the western side of Lowell Park.

Rani Engineering Solution

MSB 6901 Diversion Project, White Bear Lake, MN

Client Needs

Phase 1 of the Northeast Interceptor is 34,000 feet of proposed force main interceptor sewer with a capacity of approximately 30 million gallons per day. The upstream end connects to the Upper Beltline Interceptor near the intersection of Highway 61 and I-694 in Maplewood, and the downstream end connects to the Middle Beltline Interceptor near Minnehaha Avenue and Johnson Parkway in St. Paul.

Rani Engineering Solution