- Environmental Assessment Worksheet (EAW) and Environmental Impact
- Statement (EIS) preparation
- Cultural and historic site identification
- NPDES permit compliance
- Environmental due diligence
- Site investigation and remediation
- Hydrogeology and groundwater resources
- Regulatory permitting and compliance
- Asbestos inspection
Project Examples
- Stillwater Flood and Retaining Wall Project, Stillwater, MN
- MSB 6901 Diversion Project, White Bear Lake, MN
Stillwater Flood and Retaining Wall Project, Stillwater, MN
Client Needs
This project provides flood control and protection to the city of Stillwater. The project is divided into three stages. Stage 3 includes constructing a low floodwall/levee along the western side of Lowell Park.
Rani Engineering Solution
- Completed a Phase I Environmental Site Assessment (ESA) along the proposed flood barrier alignments
- Evaluated subsurface information along the project alignment and in the area of the development
- Identified potential areas of concern with respect to contamination and/or Hazardous, Toxic and Radioactive Waste (HTRW) materials

MSB 6901 Diversion Project, White Bear Lake, MN
Client Needs
Phase 1 of the Northeast Interceptor is 34,000 feet of proposed force main interceptor sewer with a capacity of approximately 30 million gallons per day. The upstream end connects to the Upper Beltline Interceptor near the intersection of Highway 61 and I-694 in Maplewood, and the downstream end connects to the Middle Beltline Interceptor near Minnehaha Avenue and Johnson Parkway in St. Paul.
Rani Engineering Solution
- Analyzed floodplain and wetland impacts
- Determined historical and archaeologically sensitive locations
- Recommended contingency plan during construction based on an environmental site assessment by coordinating and reviewing an environmental profile for groundwater flow, water table impact and contaminated areas